Online Integrated Luminosity

ALICE: 31.94 nb-1      ATLAS: 31.2 nb-1      CMS: 31.69 nb-1      LHCb: 2.12 nb-1     

Latest 5 LHC Fills

Fill Fill Times Energy
[Gev]
Intensity Bunches Peak Luminosity
[Hz/mb] = [1027 cm-2s-1]
Delivered Luminosity
[ub-1] = [1030 cm-2]
Fill
Start
SB
Start
[hh:mm]
SB
Duration
[hh:mm]
B1
[1012]
B2
[1012]
B1 B2 ATLAS ALICE CMS LHCb ATLAS ALICE CMS LHCb
354401:11 10/02/201303:282:3540004.326.26 Pb: 338 p: 338112.4101.1116.45.4803.2858.7827.437.2
354315:25 09/02/201318:316:3440004.256.12 Pb: 338 p: 13109.3124.4111.45.11473.81670.81484.466
354207:52 09/02/201310:403:5740004.085.86 Pb: 338 p: 33899.4102.5106.74.81011.71171.21066.232
354119:13 08/02/201302:425:0240004.185.86 Pb: 338 p: 338100.5100.6102.84.71119.31282.91138.241.9
354014:36 08/02/201316:451:5740004.053.71 Pb: 314 p: 27274.185.675.82.6225.9453.6423.413.7

Integrated Luminosity Evolution

LHC Efficiency and Availability

LHC Run Efficiency

Run Availability

Based on LHC Physics Schedule

Total Run Time 21 days 10 hrs 32 mins
Cryo Availability21 days 3 hrs 5 mins98.6 %
Fault Downtime3 days 4 hrs 29 mins14.9 %

Recent Availability

Total Run Time 5 days 1 hrs 16 mins
Cryo Availability4 days 20 hrs 21 mins96 %
Fault Downtime0 days 13 hrs 10 mins10.9 %

Recent Faults: The top 5 list

Fill DurationSystem
35346:13Cryogenics/Cold compressor
35414:33QPS/Hardware
35300:56PS/No beam
35380:42SPS/No beam
35310:30PS/No beam

LHC Efficiency in last 7 days

©Cern. All rights reserved. Designers: Remy Pinget and Alick Macpherson. Consultants: Yngve Levinsen, Mario Terra Pinheiro and Shaun Roe